Kota. Hadoti remained thanks to clouds on the second day on Sunday. Saturday morning the day began with a rainy season continued on Sunday. Many villages have become an island of the rain. In many parts of town were flooded.
Due to rains in Kota Anantpura pond flooded many houses. Jawahar Nagar, Balakund, Nyapura, Chandragta flooded several low-lying areas. In the city on Sunday evening at half past eight to half past five recorded 11.6 mm of rain. Maximum temperature 28 degrees Celsius and minimum temperature was 24.3 degrees Celsius.
Mondana Gopalpura near Kota district fell flat in the cast. Relganv rain water entered several houses. Ramganjmandi, Etawah, Arndkedha, Chechat, Kathun Mndana and hold on - wait another four hours Sunday evening spell of rain. Bundi district rimjhim Sunday morning began a round of rain, the afternoon slipped. 8 am to 16 in Bundi, Taledha 15, Keshvraypatn 39 in, 91.2 in Indragdh, Nanwan 14 mm rainfall recorded in the 41 and Hindoli.
Jhalawar district of Jmajm Kalisindh, Ahu, desolate, Chandrabhaga, Prvn has led to a boom and many other rivers. Bimsagr Dam gate open all five of the desolate river Mahira, Pkrana, Dhikedha, Bni, Jtedi, Sidola, Ranyakedi, Llawata Ganwaen including the spread of water in these villages were cut off from contact Khanpur and Panvadh. These villages have been flooding in the lower settlements. The Administration has taken some empty houses. While some settlements Nangli Panvadh to boom in the river was flooding. Sthanaen had to go to other people.
Strongly pounded in the Baran district on Sunday. Rain, dozens of mud houses have collapsed. 44 mm rain was recorded at 104 and Baran in Cbra. Following the close Kdayachor Bathli linen wrap and khajuri Jlvadha area than the island Balapura and Kishanpura Ganav remain surrounded by water. In the last twenty-four hours Sunday morning by eight o'clock in the Baran district recorded the highest 92 mm.
Many road closed
Parvati river quota of boom - Sheopur route, from the boom in Kalisindh Panvadh - Kota route was blocked. Û eat from the water near the bridge of Nagonia Jhalawar - Baran Megahaive been stalled traffic. Prvn bridge from the water Aklera - Baran Road route was closed. Roadblocks on the way to having water Khatuli Jrel culvert about 25 days off.
Listen
Read phonetically
Rate translation
Job
Bhai mera mara hai dard bhi mujko hai